Our Offering
One shell.
Three ways to own it.
Every pool leaves the factory the same way. What changes is where our work stops and yours begins — and that is entirely your call.
How far do you want us to go?
All three include the shell and its equipment. Every pool includes 1 skimmer; return fittings and main drains are optional unless specified.
The DIY Package
We deliver the pool — you do the rest.
- Pool shell
- Pump
- Filter
- Frog mineral system
- Lights
Custom equipment packages available. First-time installers require a professional onsite for warranty coverage. One day of onsite assistance is included per your contract.
Dig–Drop–Set Package
We install your pool — you do the electrical & finishing.
- Pool shell
- Pump
- Filter
- Frog mineral system
- Lights
- Installation
- Electric done by others
- Concrete done by others
Bond beam required within 10 days. Non-dealer installs require bond beam or decking photos.
Turnkey Package
We install your pool, electrical and concrete.
- Pool shell
- Pump & filter
- Frog mineral system
- Lights
- Installation
- Electric up to 50′
- 3′ wide cantilever concrete
Electric beyond 50′ and concrete beyond 3′ are charged by footage. Premium concrete, pavers, and equipment upgrades are available at extra cost.
All three, side by side
Scroll the table sideways on a small screen.
| What’s covered | DIY | Dig–Drop–Set | Turnkey |
|---|---|---|---|
| Pool shell | |||
| Pump, filter & lights | |||
| Frog mineral system | |||
| Installation | |||
| Electrical | Up to 50′Beyond that charged on footage | ||
| Concrete | 3′ cantileverWider, stamped or pavers at extra cost | ||
| Onsite assistance | 1 dayRequired for first-time installers | Included | Included |
| Install photos for warranty | All 7 stages | Bond beam or decking | Not needed |
Three steps from bare ground
to first swim.
The same three stages happen whichever package you choose. On a DIY build they are yours to run; on a turnkey build we run them for you.
Step 1
Excavate
The hole is dug to the shell’s own profile and the base prepared, so the pool sits dead level from the moment it lands.
Step 2
Drop & set
The shell is craned in and set. Our technician supervises the drop and cuts the necessary fittings — on every package, DIY included.
Step 3
Backfill & finish
Plumbing, backfill, bond beam, decking. Water goes in and the backyard stops being a building site.
The fine print
What keeps the warranty valid.
Short, and it applies to every package. Worth reading before the excavator arrives rather than after it leaves.
A bond beam to lock the pool in is required within 10 days of installation. This applies to every package.
For your warranty to be valid, an experienced professional pool installer must guide you through the installation. Every DIY purchase includes one day of onsite assistance for the fee defined in your contract, and our technician supervises setting the shell into the prepared hole and cutting the necessary fittings.
DIY and non-dealer installations require photographs of the entire process. For the warranty to be valid we need all seven:
- Excavation
- Shell drop
- Hole base
- Backfill
- Plumbing
- Before decking, with rebar and wire bonded if used
- Bond beam and/or decking installed
Non-dealer installations need photographs of the bond beam installed, or of the concrete decking.
All pools include 1 skimmer. Return fittings and main drains are optional unless specified. Custom and brand equipment packages are available on any package.
Ready to bring your dream pool to life?
Explore our collections or connect with a local dealer to get started.